REGCO Order 10 Dash-8 Q-400's

This forum has been developed to discuss aviation related topics.

Moderators: Sulako, lilfssister, North Shore, sky's the limit, sepia, I WAS Birddog

ninjacrumb
Rank 2
Rank 2
Posts: 90
Joined: Wed May 12, 2004 2:08 pm

Post by ninjacrumb »

I sense another Skywalker debaucle. Or better City Express.
---------- ADS -----------
 
The dude abides.
Hotel Tango
Rank 4
Rank 4
Posts: 241
Joined: Tue May 31, 2005 11:49 pm

Post by Hotel Tango »

nblythin wrote:Maybe we're looking at this all wrong.
Forget a bridge, and forget the ferry... we need a tunnel!

I live in Niagara, and we have a couple of tunnels that go under the Welland Canal.
The canal is wider than the gap between the lakeshore and island... and is probably deeper too.
I believe there is a tunnel. Rumor has it, it was dug a while ago and was almost complete until another election and a new mayor who killed it. When will people realize that cancelling and paying off the contractors for a project that will eventually just come right back is more costly than just letting it get built!
---------- ADS -----------
 
TorontoGuy
Rank 6
Rank 6
Posts: 461
Joined: Mon Nov 28, 2005 10:39 am
Location: Toronto

Post by TorontoGuy »

A tunnel has been talked about for years, too. But it's such a narrow strip of water, most of the decline roadway has to be under land, not water, and there's not enough space on the island side before you run into the buildings and then the airfield.

They did start building a tunnel back in 1935. Here's the history.

http://www.torontoport.com/airport_history.asp

Interestingly, in the '30s, when both Malton and the island airport were built, it was the island facility that was meant to be the city's chief airfield.
---------- ADS -----------
 
teacher
Rank 10
Rank 10
Posts: 2450
Joined: Thu Feb 19, 2004 3:25 pm

Post by teacher »

The big worry for the island residents and a few condo owners is that a bridge (or tunnel) means more planes and the increased likelihood that the airport will stick around for awhile. The reason for the push is just that, if they spend money on it and make it profitable it'll be harder to close.
---------- ADS -----------
 
EI-EIO
Rank 7
Rank 7
Posts: 604
Joined: Sat Jan 15, 2005 1:16 pm
Location: Toronto, ON
Contact:

Post by EI-EIO »

CYTZ is safer too - I remember when two light aircraft went down in a week. The first was on approach to YTZ and they were fished out (including dog) by the patrol boat. The second was to Buttonville I think and crashed just short of IBM Markham.

All of the alternatives involve overland approaches and Pickering will involve paving over a huge swath of green space - I have more issues with that!

Building a tunnel would be way more expensive but would remove objection from the shipping people who feared it would interfere with navigation. For a short dist like that "cutting, sinking sections and covering" is feasible.
---------- ADS -----------
 
Fred Flinstone
Rank 1
Rank 1
Posts: 15
Joined: Tue Nov 01, 2005 6:33 pm
Location: Bedrock FireHall

Post by Fred Flinstone »

Hey teacher I thought you getting your IFR :smt097
---------- ADS -----------
 
jimmyjazz
Rank 3
Rank 3
Posts: 195
Joined: Sun Feb 15, 2004 9:59 pm

Post by jimmyjazz »

Maybe we could just put a ramp on each side and everyone can just knevil over.
---------- ADS -----------
 
User avatar
AOW
Rank 6
Rank 6
Posts: 465
Joined: Fri May 20, 2005 2:23 pm

Post by AOW »

TorontoGuy wrote:Air Canada just jumped on the band wagon.

"As Toronto City Center Airport's longest serving passenger airline, Air
Canada is pleased that the TPA has decided to improve access to the airport.
This decision will allow Air Canada, through its regional partner, Air Canada Jazz, to re-instate flights previously cancelled due to the lack of demand caused by inadequate access to the airport under the existing ferry service," said Ben Smith, Vice-President, Network Planning, Air Canada.
With the improved access to Toronto City Centre Airport, Air Canada will
pursue a substantial increase of frequencies between that airport and Ottawa as well as the reinstatement of flights to and from Montreal. The carrier will also examine the feasibility of additional flights between TCCA and other regional destinations in Canada and the U.S.

http://www.newswire.ca/en/releases/arch ... c3362.html
I find this comment most interesting, because according to the rumours I have heard, JAZZ employees at CYTZ have been told that Feb. 28th is going to be their last day here. Apparantly the space leased to Deluce includes the current Jazz terminal, so they will have to stop operations, at least until they can find a new home on the island. It seems strange that they are so positive about their future, while they only seem to have one option for a new location on the island: the land belonging to the guy who ran City Express, who was put out of business by Air Ontario back in the 80s. It will be interesting to see how this pans out... which will win over V.P.'s heart: money or revenge...

AOW
---------- ADS -----------
 
bobcaygeon
Rank 7
Rank 7
Posts: 724
Joined: Sat Mar 12, 2005 8:03 am

Post by bobcaygeon »

air canada doesn't give a shit about the island!! So neither does jazz cause Ac tells Jazz where to fly and pays them at set fee no matter the load.
I think AC would love to see the island close and by increasing flites there it will cause the treehuggers to get even more vocal and force Miller into more action !!!!!
---------- ADS -----------
 
C-FABH
Rank 8
Rank 8
Posts: 783
Joined: Thu Jan 26, 2006 8:06 am

Post by C-FABH »

AOW wrote:I find this comment most interesting, because according to the rumours I have heard, JAZZ employees at CYTZ have been told that Feb. 28th is going to be their last day here. Apparantly the space leased to Deluce includes the current Jazz terminal, so they will have to stop operations, at least until they can find a new home on the island.
My interesting theory: Jazz will be moving to the old terminal, and Esso vacating to a temporary shelter next-door. There were a few backhoes next to Esso the other day, so I'm just putting two and two together.
---------- ADS -----------
 
Post Reply

Return to “General Comments”